Redaelli is back in LAAX

After the Treis Palas-Crap Masegn and Alp Dado-Crest La Siala plants, Redaelli is supplying the cables for constructing the Laax skiing facilities in the Grisons Canton. For the construction of the Sogn Martin-La Siala system, Redaelli supplied Leitner with a Redmont 7K loadbearing and traction cable 59 mm in diameter and 6,970 metres long: 96 tonnes – the heaviest cable ever taken to these heights by the company – and tasked with the highly delicate transportation phase, Wipfli.

Redaelli has supplied for the Treis Palas since 2011, when it supplied a Redmont 636 for the Alp Dado facilities, which was 46 mm in diameter and 3,330 metres long. In 2012 it supplied them with a Redmont 725 cable, 46 mm in diameter and 3, 090 long. The modernness, comfort and high performance levels of Leitner plants therefore continue to be guaranteed by the competence and experience of the Redaelli brand. 

With Redaelli, quality and safety remain to be the most important thing to the ompany. 

Get the free newsletter

Sign up for news, trends and equipment for sale in the lifting and rigging industry.
By signing up you agree to our Terms of Use and Privacy Policy. You may unsubscribe at any time.

Latest Products For Sale

Type Description
Equipment National Brand - Used 5x7 and 6x12 Dies - All dies meet specifications - Various…
Equipment 100 Feet of Steel Framing • Last four sections of pre-owned 1.3 mil test bed…
Equipment 300K – 62 ft. PTM SATEC • Hydraulic guards • 62’ overall length • 6’…
Equipment 100K x 40 ft. Single Range, 7.5HP Manual Control Texmate Readout, 2’ Stroke – Tube…
Equipment Refurbished 500K Lucker Wire Rope Grip • Manual Operated • Front Face Mount • 500,000…

News & Articles