Redaelli is back in LAAX

After the Treis Palas-Crap Masegn and Alp Dado-Crest La Siala plants, Redaelli is supplying the cables for constructing the Laax skiing facilities in the Grisons Canton. For the construction of the Sogn Martin-La Siala system, Redaelli supplied Leitner with a Redmont 7K loadbearing and traction cable 59 mm in diameter and 6,970 metres long: 96 tonnes – the heaviest cable ever taken to these heights by the company – and tasked with the highly delicate transportation phase, Wipfli.

Redaelli has supplied for the Treis Palas since 2011, when it supplied a Redmont 636 for the Alp Dado facilities, which was 46 mm in diameter and 3,330 metres long. In 2012 it supplied them with a Redmont 725 cable, 46 mm in diameter and 3, 090 long. The modernness, comfort and high performance levels of Leitner plants therefore continue to be guaranteed by the competence and experience of the Redaelli brand. 

With Redaelli, quality and safety remain to be the most important thing to the ompany. 

Get the free newsletter

Sign up for news, trends and equipment for sale in the lifting and rigging industry.
By signing up you agree to our Terms of Use and Privacy Policy. You may unsubscribe at any time.

Latest Products For Sale

Type Description
Equipment Wirop WPT-200/20 Horizontal Test Machine. High Range Capacity: 440,000 lbf. Low Range Capacity: 48,000 lbf.…
Equipment 40 Ton Swager - Demo Working range: Single/multistage T-ferrules – T 09 / T 13…
Lifting Products
Rope
3” x 600’ Double Braid Nylon Rope with eyes on each end.
Lifting Products
Rope
1-1/2” x 600’ Poly pro rope
Equipment Hoist Lift Truck Electric Lift Model#FKE15 Year 2003 Max Load 30,000 lbs Battery 72 volt…

News & Articles