Redaelli Completed the Installation of Tenso Structures for the New Krasnodar Stadium

The new Krasnodar Stadium, with a capacity of 36,260 spectators, will be completed in 2015. Redaelli is taking part in the project providing the supply and installation of the speciality steel tenso structures, purposely designed and produced for the arena. Over 510 steel ropes for a total mass with sockets of 450 tons weave the whole structure of the arena’s roof covering the grandstands. The roof is designed as classical looped cable roof and containing two compression and on tension ring. While the majority is covered with a PTFE membrane, the inner edge has a glass roof.

Get the free newsletter

Sign up for news, trends and equipment for sale in the lifting and rigging industry.
By signing up you agree to our Terms of Use and Privacy Policy. You may unsubscribe at any time.

Latest Products For Sale

Type Description
Lifting Products
Beams
Modulift Modular Spreader Beams provide the ideal solution for most lifting requirements – versatile and…
Wire Rope 1/16 1x7 GAC - 330,000' Total (16 - 5,000' reels / 21 - 10,000' reels…
Wire Rope 3/16 7x7 SS - 45,000feet (9 reels x 5,000')
Wire Rope 7/8" 6x25 Super Swaged IWRC wire rope Korean (2862531212) 7 x 1675' , 1 x…
Equipment HERCULOC - 800 Ton Wire Rope Swager- Refurbished Originally owned by the US Navy Hydraulics…

News & Articles