LM Handling’s First Chinese Mooring Project Successful

LM Handling, an Acteon company, has provided handling expertise and equipment to support Acteon sister company, InterMoor, in the successful mooring installation of a floating production, storage and offloading (FPSO) unit for the China National Offshore Oil Corporation (CNOOC) operated Enping 24-2 oilfield in the South China Sea.

With LM Handling’s lifting and handling expertise and equipment, a 12-pile anchor mooring system, consisting of three clusters of four mooring lines, was installed.

LM Handling provided its StabFrame-S in its extended configuration, pre-loaded with additional ballast to achieve a stable and safe install for the long mooring piles, and 84 and 60 in. internal lift tools. With a customised set of handling equipment, which enabled pile upending on the seabed, InterMoor was able to use a relatively lightweight construction vessel to install the piles quickly, efficiently and safely. 

This mooring project represents LM Handling’s first project in Chinese waters and second project for the StabFrame-S, which was specifically designed for lightweight South East Asia vessels. It is the fourth successful FPSO mooring project for LM Handling.

Robin van der Bij, managing director at LM Handling, said, “The Enping project has been a positive demonstration of how company collaboration can overcome difficult challenges and secure the smooth delivery of a project. It also means a fourth successful FPSO mooring installation for the StabFrame, which guides the piles into the location and stabilises them to assist with penetration.”

InterMoor led the project, bringing together specialist services from Acteon group companies, including MENCK for the piling spread and newly acquired UTEC Survey for the data requirements.

Enping 24-2 oilfield is in the Pearl River Mouth basin of the South China Sea, which has water depths between 86 and 96 m. The main production facilities include a drilling and production platform, an FPSO and 17 producing wells. CNOOC has announced that two wells are producing approximately 8,000 bbls/d of crude oil. The project is expected to reach peak production of 40,000 bbls/d in 2017.

Get the free newsletter

Sign up for news, trends and equipment for sale in the lifting and rigging industry.
By signing up you agree to our Terms of Use and Privacy Policy. You may unsubscribe at any time.

Latest Products For Sale

Type Description
Wire Rope 1-1/8” Dyform 34LR 2160 PI GLV RLL 173,800 lbs. UK 1 x 1153 Feet
Wire Rope 1-1/8” 6x26 EIPS IWRC RRL MBL 130,000 lbs Domestic 1 x 1024 Feet
Wire Rope 1” 6x19s EIPS IWRC RRL MBL 103,400 LBS Domestic 1 x 4970 Feet
Wire Rope 1” 6x19s EIPS IWRC RRL MBL 103,400 LBS Domestic 1 x 1490 Feet
Wire Rope 14mm Dyform 34LR 1960 PI GLV RLL MBL 40,200 lbs Indonesia 1 x 5150 Feet

News & Articles