Golden Ray Salvage: Final Cut Complete!

Responders completed cutting operations on the remainder of the Golden Ray wreck on Saturday.  Story Continues Below Photo

The VB-10000 prepares to shift with Section Five on Sunday into a position favorable for lifting operations after separating the remainder of the wreck into two sections on Saturday. St. Simons Sound Incident response video.

See that video (screen captured above) at this link.

Wreck removal personnel separated the remainder of the Golden Ray wreck into two sections on Saturday and they are preparing to lift and stow Section Five onto a dry-dock barge. Once the Section Five is removed, response engineers will prepare Section Four, the final remaining section, to be lifted and stowed onto the Barge JULIE B which left the Port of Mobile enroute to Brunswick, Ga. on Thursday. A dry-dock barge remains on-site as a contingency plan for stowing Section Four.

Pollution response teams remain on-station to monitor for any oil or debris present around the perimeter of the Environmental Protection Barrier. Shoreline survey teams continue routine assessments of Jekyll Island, St. Simons Island and marsh areas in the vicinity of the wreck site.

Read our prior report on this story at this link.

 

Get the free newsletter

Sign up for news, trends and equipment for sale in the lifting and rigging industry.
By signing up you agree to our Terms of Use and Privacy Policy. You may unsubscribe at any time.

Latest Products For Sale

Type Description
Lifting Products
Chains
5/8 GR80 Alloy Chain Self Color 150' drums
Lifting Products
Hooks
3/8 GR43 Clevis Grab Hooks Self Color
Lifting Products
Chains
1/4 GR43 High Test Self Color Chain (.38" Inside link Width) 800' drums
Lifting Products
Chains
1/4 GR30 Proof Coil Self Color 141' Pails
Lifting Products
Chains
1/8 GR30 Proof Coil Hot Dip Galv Chain 1,500' drums

News & Articles